Torvane provides independent project-condition assessment for insurers evaluating construction and project-related trigger events, controls, material changes, and risk-improvement priorities.
Services for Insurers
Project insurance risk advisory
Torvane assesses the project conditions, controls, evidence, and changes that may create or amplify insurance exposure. Engagements are defined for the insurance structure, project stage, available information, insurer instructions, reporting audience, and work required.
Identification of the project events and conditions that may create a claim pathway under the relevant insurance program, together with the evidence, controls, information gaps, and monitoring requirements associated with those conditions.
Monitoring and escalation requirement identification
Underwriting and risk briefing support
What we do
Torvane identifies the project conditions that may create or amplify an insured trigger event and assesses the available evidence, controls, information gaps, and monitoring requirements associated with those conditions.
Work performed
Review the insurance context, project description, construction stage, scope, location, values, delivery structure, schedule, and relevant policy or insurer information supplied for the assignment
Identify material physical-damage, delay, milestone, performance, workmanship, design, defect, supply-chain, testing, commissioning, weather, water, fire, security, and site-event scenarios relevant to the project and agreed insurance scope
Map each relevant scenario to the project activities, assets, interfaces, controls, records, and conditions that may affect whether the event occurs or its consequences are amplified
Review evidence available for each pathway and distinguish established conditions from management assumptions, incomplete records, unresolved issues, or matters requiring further verification
Identify project conditions that require insurer attention, risk improvement, monitoring, updated information, or escalation
Prepare a clear project-condition view without interpreting coverage, determining liability, or making an underwriting decision
What you receive
Project Insurance Trigger-Event Assessment
Trigger-Event and Project-Condition Register
Exposure Pathway Map
Evidence and Information-Gap Log
Project-Control and Monitoring Observations
Underwriting and risk briefing materials
When it is used
Before underwriting or renewal of project-related insurance
Before accepting a new construction, DSU/ALOP, liquidated-damages, workmanship, defect, or related exposure
When project information is incomplete or risk conditions require independent assessment
When an insurer requires a structured view of the project conditions relevant to exposure
Assessment of the project conditions that may lead to delay-related exposure, including DSU/ALOP, liquidated-damages, performance-delay, and related project-insurance concerns where relevant to the assignment.
Baseline schedule and update-quality review
Critical and near-critical path assessment
Float, milestone logic, sequencing, constraint, and change-control review
Critical equipment, supplier, and recovery lead-time review
Schedule-control and progress-reporting assessment
Actual-versus-planned progress and forecast-date review
Schedule change and early-warning framework
What we do
Torvane assesses the schedule, milestone, interface, procurement, testing, and control conditions that may create delay-related insurance exposure or indicate that such exposure requires monitoring.
Work performed
Review baseline schedules and current updates for logic, sequencing, critical and near-critical paths, milestone relationships, float, constraints, progress rules, update discipline, and change control
Identify interfaces, dependencies, constraints, long-lead items, critical equipment, material suppliers, fabrication slots, transport routes, installation requirements, testing windows, and recovery lead times that may affect exposed milestones
Assess actual versus planned progress and identify movement in critical-path conditions, milestone dates, schedule contingency, or remaining-duration assumptions
Delivery-party capability, capacity, and control review
Assessment of whether contractors, subcontractors, suppliers, project leadership, and delivery-control systems have the demonstrated capability, available capacity, and operating discipline to manage project conditions that may create insurance exposure.
Contractor, EPC/EPCM, subcontractor, supplier, and leadership-role review
Comparable-project experience and performance review
Backlog, work-in-progress, work-not-started, and concurrent-commitment assessment
Labor, training, productivity, travel, and ramp-up condition assessment
Supplier and subcontractor quality, capacity, and continuity review
SOP, reporting, change-control, risk, and corrective-action process review
What we do
Torvane assesses whether the delivery parties and their control systems have the demonstrated capability, capacity, and operating discipline to manage the project conditions relevant to insurance exposure.
Work performed
Review contractor, construction-manager, EPC/EPCM, key subcontractor, supplier, and project-leadership roles relevant to the project and agreed mandate
Review comparable-project experience, stated completion performance, quality outcomes, delay history, rework, warranty matters, incidents, claims, loss history, and lessons information provided
Review backlog, work in progress, work not started, major concurrent commitments, workload concentration, shared-resource constraints, project staffing allocation, and delivery continuity considerations
Review craft and supervisory availability, skill mix, recruitment, retention, training, labor agreements, travel or accommodation arrangements, productivity assumptions, and workforce ramp-up conditions
Review key subcontractor and supplier capability, capacity, quality record, financial-continuity indicators where available, critical dependencies, and the insured project’s exposure to those parties
Review operating procedures for planning, change control, procurement, quality, risk, issue escalation, reporting, corrective-action closure, and management review
What you receive
Delivery-Party Capability, Capacity, and Control Assessment
Contractor and Critical-Subcontractor Profile
Backlog, Work-in-Progress, and Resource-Capacity Review
Comparable-Project Performance and Lessons Register
Management Depth, Workforce, and Key-Resource Assessment
Control-System and Information-Gap Log
Underwriting and risk briefing materials
When it is used
Before underwriting a contractor-dependent project exposure
Before accepting or renewing liquidated-damages, delay, workmanship, defect, or construction-related insurance
When contractor capacity, concurrent workload, leadership depth, workforce availability, or supplier capability is material to the insurer’s view
When contractor performance information requires independent organization and assessment
Assessment of whether project quality systems and field controls are capable of preventing, detecting, documenting, and correcting workmanship, installation, material, interface, and design-management conditions that may create physical-damage, rework, defect, delay, or related insurance exposure.
Quality-management plan and accountability review
QA/QC, inspection, test, hold-point, witness-point, and material-traceability review
Nonconformance, corrective-action, root-cause, recurrence, and closure-process assessment
Design information, technical-query, constructability, coordination, interface, and change-control review
Fabrication, installation, system integration, testing, commissioning, and handover-control assessment
Subcontractor qualification and supplier-quality oversight review
Rework, defect, warranty, incident, claims, loss, and lessons-learned review
Quality audit, reporting, and management-review assessment
What we do
Torvane assesses whether quality systems and field controls are capable of preventing, detecting, documenting, and correcting workmanship, installation, material, interface, and design-management conditions relevant to project-insurance exposure.
Work performed
Review the project quality-management plan, organization, accountabilities, quality objectives, reporting arrangements, audit processes, and management-review practices
Review inspection and test plans, hold points, witness points, material traceability, test documentation, installation records, acceptance records, and the evidence available for critical work
Review nonconformance, corrective-action, root-cause, recurrence, verification, and closure processes
Assessment of site conditions, physical-loss exposures, and loss-prevention controls relevant to construction and project-insurance risk.
Site layout, access, circulation, storage, temporary-work, and critical-installation review
Fire protection, hot-work, water-management, drainage, weather, security, emergency-response, lifting, housekeeping, and storage-protection assessment
Natural-catastrophe, geographic, local-infrastructure, ground, water, access, and external-site condition review
Critical material and equipment storage, transit, off-site fabrication, accumulation, delivery, and protection assessment
Construction, testing, commissioning, and start-up condition review
Site risk-management and insurer/broker recommendation status review
Risk-improvement action development
Material-change and policy-notification observations
What we do
Torvane assesses site conditions, physical-loss exposures, and loss-prevention controls relevant to construction and project-insurance risk.
Work performed
Review site layout, access, circulation, storage, temporary works, critical installations, construction sequencing, utilities, and conditions affecting physical-loss exposure
Review fire protection, hot-work controls, water management, drainage, weather preparedness, site security, emergency response, lifting, housekeeping, storage protection, and protection of critical materials and equipment
Review natural-catastrophe, geographic, local-infrastructure, access, weather, ground, water, and external-site conditions relevant to the project
Review storage, transit, off-site fabrication, accumulation, delivery, and protection arrangements for critical materials and equipment
Review construction, testing, commissioning, and start-up conditions that may alter physical-loss or delay exposure
Review risk-management practices, insurer or broker risk recommendations where provided, and status of risk-improvement actions
Identify conditions requiring further information, risk-improvement action, monitoring, or insurer attention
What you receive
Site, Physical-Loss, and Loss-Prevention Assessment
Insured Peril and Site Exposure Register
Site Protection and Critical-Control Review
Natural-Catastrophe and External-Condition Observations
Risk-Improvement Action Register
Material Change and Policy-Notification Observations
Underwriting and risk briefing materials
When it is used
Before binding or renewing construction all risks, erection all risks, builders-risk, or related physical-damage cover
Before or during site surveys, site risk-assessment reviews, or major phase changes
When storage, transit, off-site fabrication, testing, commissioning, weather, fire, water, security, or site conditions are material
When insurers require confirmation of risk-improvement status or site-control effectiveness
Identification of project changes that may alter the trigger-event pathways, controls, evidence base, or insurance exposure assessed at underwriting or in a prior review.
Scope, value, schedule, duration, construction-method, site-condition, and delivery-party change review
Critical equipment, supplier, testing, commissioning, and operational-start change assessment
Schedule-control, workforce, quality, supply-chain, contractor-capacity, and risk-improvement status review
New or changed trigger-event pathway identification
Material-change record, risk-register, project-report, and notification-practice review
Updated exposure and information-requirement assessment
Risk-improvement action status review
Insurer information and escalation briefing support
What we do
Torvane identifies project changes that may alter the trigger-event pathways, controls, evidence base, or insurance exposure assessed at underwriting or in a prior review.
Work performed
Review changes to project scope, values, schedule, duration, construction method, site conditions, contractor or subcontractor structure, supplier status, critical equipment, testing, commissioning, or operational-start plan
Review changes in schedule controls, workforce availability, quality trends, supply-chain conditions, contractor capacity, risk-improvement status, project reporting, or other control conditions relevant to the assignment
Identify new or changed physical-loss, delay, milestone, performance, workmanship, defect, or site-event pathways
Review material-change records, schedule updates, risk registers, issue logs, project reports, and notification practices for completeness and relevance to insurer monitoring
Insurance-risk assignments may include a project insurance trigger-event assessment, schedule and milestone exposure reviews, delivery-party capability assessments, quality and defect-control reviews, site and loss-prevention assessments, material-change monitoring, and risk-improvement registers.
Torvane’s role, work plan, policy and project information requirements, site-access requirements, reporting format, timing, and commercial terms are defined for each assignment. Engagements may support underwriting, renewal, site review, risk improvement, portfolio monitoring, material-change assessment, or technical event review.
Contact
Discuss an insurance-risk assignment
Begin with the project, insurance context, current risk concern, and the project conditions that require independent review.